Project: ALSCON Gas Project

PHC Status Report
ALSCON Gas Project

The Aluminium Smelter Company of Nigeria (ALSCON), located in Ikot Abasi, Akwa Ibom State, is set for revitalization following a $1.2 billion agreement signed in November 2024 between BFI Group, ALSCON's core investor, and the China National Chemical Engineering Corporation (CNCEC). This initiative aims to rehabilitate ALSCON's 135 million standard cubic feet per day (MMscfd) gas processing plant, which is integral to resuming aluminium production. Once operational, ALSCON is projected to produce up to one million metric tonnes of aluminium annually and generate approximately 540 megawatts of electricity, significantly contributing to Nigeria's industrial and energy sectors.

📩 Correspondence

Progress

The Aluminium Smelter Company of Nigeria (ALSCON), located in Ikot Abasi, Akwa Ibom State, is set for revitalization following a $1.2 billion agreement signed in November 2024 between BFI Group, ALSCON's core investor, and the China National Chemical Engineering Corporation (CNCEC). This initiative aims to rehabilitate ALSCON's 135 million standard cubic feet per day (MMscfd) gas processing plant, which is integral to resuming aluminium production. Once operational, ALSCON is projected to produce up to one million metric tonnes of aluminium annually and generate approximately 540 megawatts of electricity, significantly contributing to Nigeria's industrial and energy sectors.

Barriers

No barriers identified.

Further Work

No further work defined.

[+] Top Risks (0)

No top risks defined in concerns list.

[+] Concern Classifications

Total Concerns 0 | 0 Open | 0 Closed

TECHNICAL
T1 Project Scope
T2 Design / Eng.
T3 Technical Processes
T4 Construction
T5 Startup
T6 Logistics / Warehouse
COMMERCIAL
C1 Feasibility/Business Case
C2 Market/Product
C3 Finance / Funding
C4 Estimate Uncertainties
C5 Suppliers / Vendors
C6 Legal / Contract Terms
C7 Currency/Inflation
C8 Tax/Tariff
MANAGEMENT
M1 Project Management
M2 Project Organisation
M3 Communication
M4 Project Resourcing
M5 Operations / People
M6 Operations / Permits
M7 Operations / Logistics
M8 Project Quality
M9 Health / Safety / Environment
REGIONAL
R1 Environment / Weather
R2 Security / Language
R3 Regulations
R4 Infrastructure
R5 Utilities
R6 Approvals / Permits / Licenses
R7 Workforce Availability / Capability
R8 Political / Government

00 gen

[+] CLAMPED Engagement

Total Engagement Comments 0

[+] Heatmap (0 open risks)

Current Ranking

P \ I12345
5
4
3
2
1

Residual Ranking

P \ I12345
5
4
3
2
1

Risk Summary

ID Title Owner Current Score Residual Score
No risk data available for this project.

[+] Dashboard (0 risks)

Distribution - All

Open (0)
Current
H
(0)
M
(0)
L
(0)
Residual
H
(0)
M
(0)
L
(0)
Top Risks (0)
Current
H
(0)
M
(0)
L
(0)
Residual
H
(0)
M
(0)
L
(0)
Proposed (0)
Closed (0)

Exceptions

Risks Overdue (0)
Risks with Actions Overdue (0)
Risks to Review (0)
Risks with Actions to Review (0)
[not assigned] (0)
Dormant (0)
No Action Plan (0)

[+] Links and Documents