Project:
471 - Springfield Nuclear New-Build Initiative
Description:
Engineering, procurement, and site teams may work to different revisions of drawings, specifications, models, or instructions, undermining plant integrity and trust in the record.
Desired Outcome:
A single, disciplined source of truth exists for current approved information, superseded information is controlled, and revision status is visible to all affected parties.
What Could Go Wrong:
Fabrication, installation, or testing is carried out to the wrong revision, creating physical non-conformance and expensive recovery work.
Current Situation:
High document volume and frequent design updates create strong risk of version drift without disciplined control.
Action Strategy:
Enforce configuration management rules, controlled issue routes, revision visibility, field verification, and periodic audit of critical documents and model status.
Concern Category:
T1 Project Scope
Location:
Analysis: Not available
| Snapshot History |
|---|
| C543_260324.pdf |